EURL-Ksentini on Paper

Civil Engineering of Electrical Substations

GRTE ALGER

Civil engineering and equipment installation works for the 60 kV ARBAA-ALGER EST-MEFTAH/CM KHEMIS EL KHECHNA line.

2019

GRTE ALGER

GRTE SETIF

Civil engineering and installation works for the 60 kV El-Eulma Chelghoum line.

2018

GRTE SETIF

GRTE ALGER

Civil engineering for 220 kV Arba/Ale2 line, 60 kV Arba/Rob and Ale/Meftah lines.

2011

GRTE ALGER

ENERGO-INVEST

Civil engineering works for the 400 kV Hadjret Ennous ElAfroun line.

2009

ENERGO-INVEST

ENERGO-INVEST

Civil engineering and installation works for the 220 kV Ghazouet substation – Souk Atlata desalination station line.

2009

ENERGO-INVEST

Assembly and Installation of Overhead and Underground Electrical Lines

GCB

Realization of the relocation of a 60 kV high-voltage overhead power line (Study and implementation) - Haoud El Hamra - Hassi Messaoud.

2022

GCB

KDL Sonelgaz

Execution studies, civil engineering works, installation, wiring, testing, and commissioning of the 60Kv line - Ain Timouchent

2019

KDL Sonelgaz

KAHRAKIB

Installation works for the 400 kV SIDI ALIBOUSSIDI - NAAMA line.

2018

KAHRAKIB

KAHRAKIB

Installation works for the 220 kV SAIDA-TIARET line.

2018

KAHRAKIB

KAHRAKIB

Installation works for the 220 kV LABREG - EL AMIRIA line.

2018

KAHRAKIB

KAHRAKIB

220 kV LABREG - EL AMIRIA line.

2018

KAHRAKIB

Assembly and Installation of Electrical Substations

EFACEC ALGERIE

Installation, testing, and commissioning of electrical and control equipment for the 30/10 kV PST4 substation, TINDOUF.

2021

EFACEC ALGERIE

CD-RL/DAM RELIZANE

Supply of electrical equipment and protection and control systems; disassembly, installation, assembly, cabling, testing, and commissioning of all supplied equipment.

2020

CD-RL/DAM RELIZANE

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Renovation works at the 220 kV ElKseur substation.

2004

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Installation of a mobile 220 kV substation at Sidi Aich.

2004

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Renovation works at the 60/30 kV El-Eulma substation.

2004

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Renovation works at the 220 kV Chekfa substation, Jijel.

2004

Direction de la Production et du Transport de l’électricité. Région Transport de Sétif

Commissioning Tests and Start-up of Electrical Substations

SONATRACH - SONELGAZ

Commissioning and testing of 21 shelter substations at 30 kV "Subject to ARH."

2024

SONATRACH - SONELGAZ

SWGFD-EPC4 SONATRACH - GCB

Commissioning and testing of equipment "Subject to ARH" (Tinerkouk Living Base).

2023

SWGFD-EPC4 SONATRACH - GCB

SWGFD-EPC4 SONATRACH - GCB

Commissioning and testing of equipment "Subject to ARH" (Tidjerane Living Base).

2023

SWGFD-EPC4 SONATRACH - GCB

SWGFD-EPC4 SONATRACH - GCB

Commissioning and testing of equipment "Subject to ARH" (Hassi Bahamou Living Base).

2023

SWGFD-EPC4 SONATRACH - GCB

SIEMENS

Testing & commissioning of the 60/30 kV Oum El BOUAGHI substation.

2016

SIEMENS

SIEMENS

Testing & commissioning of the 60/30 kV BEN MHIDI substation.

2016

SIEMENS

© 2024 Eurl Ksentini. All Rights Reserved. Developed by Mounir Mostefai